Energy Performance Contracts

Energy performance contracts (EPCs) allow NC State to make significant investments in building systems and energy infrastructure while using projected utility savings to offset project costs. Through these agreements, energy efficiency improvements and infrastructure upgrades reduce operating expenses, improve system performance and help lower campus emissions.

NC State currently has four energy performance contracts, representing more than $99 million in infrastructure investments across Central, North and Centennial campuses.

Cogeneration on Central and North Campus (2012)

Cates Avenue Utility Plant

17-year contract I $56.1 million investment

In 2012, this project replaced aging boilers in the Yarbrough Central Utility Plant with new high-efficiency boilers and installed two combined heat and power cogeneration systems at the Cates Utility Plant. The cogeneration system utilizes natural gas to produce 11 MW of electricity while the waste heat from the process produces steam. Utility savings are realized due to a reduction in the total cost of electricity and steam production through increased efficiency. The most recent annual savings for this performance contract were over $9 million.

13 Building EPC (2012)

An overal photo of NC State's Centennial Campus. Photo by Marc Hall

19-year contract I $19.7 million investment

This project installed renovations and operational improvements, including HVAC system and fume hood controls, lighting upgrades, and water conservation strategies, across 13 buildings on campus. These buildings were: Cox Hall, Poe Hall, Tompkins Hall, Caldwell Hall, Winston Hall, Wilson College of Textiles, McKimmon Center, Monteith Research Center, Research I, Dabney Hall, Carmichael Gym, Constructed Facilities Lab and the Monteith Research Center Parking Garage. The most recent annual savings exceeded $2.28 million.

Phytotron Building EPC (2014)

Students conduct research in the Phytotron greenhouse.

15-year contract I $6.2 million investment

Constructed in 1968, the Phytotron Building performs plant, animal and insect research by simulating environments from desert heat and drought to alpine cold and jungle humidity. The Phytotron EPC addressed HVAC and lighting upgrades, a connection to the central chilled water loop and research equipment improvements. Phytotron’s most recent annual savings for this performance contract exceeded $875,000.

Centennial Campus Cogeneration EPC (2019)

Centennial Campus Utility Plant

18-year contract I $17 million investment

This project removed a boiler in the Centennial Campus Utility Plant and installed a high-efficiency cogeneration system. The system includes a combustion turbine generator (CTG) that produces 5.6 megawatts (MW) of electricity and a steam turbine generator (STG) that can generate an additional 1 MW of electricity from the excess steam.  

By generating electricity and steam more efficiently, the system reduces overall energy costs. From February 2025 through January 2026,  the project achieved just over $840,524 in savings, below the projected $1.9 million. The shortfall was largely due to the CTG being offline for nearly 32% of the period. Natural gas curtailments also required the use of more expensive fuel oil, resulting in nearly $500,000 in unanticipated fuel costs.